Behind The Scenes At SSuite Office { Final }

Posted on October 15, 2017 at 5:55 AM

Below are the final screenshots of the engineering building we were contracted to electrify and wire one year ago. We have finally finished this building with the last two outside flood-lights being installed and connected.


   

   

The first image, starting from the top-left, is me wiring up the engineering shop's backup-generator. Our country's national electricity infrastructure is on the verge of collapse, which means we suffer from a lot of brown-outs. The second image is my father wiring the main office's air-conditioners. The third image is the outside flood-lights that we just installed and connected.


The last image is me wiring the Day-Night light switch for the outside flood lights. We have finally finished the engineering shop. For those who are wondering who took the photos... that would be my brother Marius{ also holding and cracking the whip as we work }.


To follow our whole progress on this massive project, have a look at the below installments that I've created.


To view our previous installments of work done:  PART ONE     PART TWO     PART THREE     PART FOUR    PART FIVE

Categories: None

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

You must be a member to comment on this page. Sign In or Register

0 Comments